REQUISITION   FOR
 110KV CABLE AND IT’S ACCESSORIES

 

RFQ No: D6-0013-P-RQ

 

 

 

 

 

 

 

REV.NO.    DATE         BY                   CHECKD           Rev.DESCRIPTION

                                              

  A            2002-12-15     Wangjin             Gu hemei           For  review                                           

                                                                     

  B             2002-12-22      Gu Hemei            Wang jin                For RFQ           

   

 

      

 

APPROVAL

IPS Integrated Management Team

DATE       :

BY          :

SIGNATURE  :


 

1.0  General

1.1  Summary

This specification specifies the technical requirements for the manufacturing, tests ,preparation of shipment and delivery of 110KV cable and associated accessories which form the scope of supply and work to the bidder.

Bidder shall read the Bidding Document carefully. Specifications for the Goods offered by the Bidders shall comply with the requirements set forth in the Bidding Documents.

In case of the conflict between documents relating to the inquiry, purchase order the following priority list shall apply:

·        Purchase order

·        Material list /schedules

·        This technical specification

·        National standards

·        International standards

The supplier shall inform /consult the owner in case there is a conflict among the above the documents.

1.2   Applicable standards

The Normative document as shown below form part of this specification. Each Normative document shall be the latest revision. All materials and work included in this specification shall conform to the applicable provisions of these Normative document.  In case of any conflicting or

likun --- 2007-04-27 21:19:14

2

different standards, the strictest one shall prevail, if the technology or materials standards adopted in the design and manufacture are not included in the scope of standards mentioned above, the Supplier should submit the selected standards to and get approval from the owner, any change made by the Supplier must obtain advance consent from the Owner.

GB 11017-89 :  Test for Power Cables with Extruded Insulation for Rated Voltages up to 110kV.

DL 509-93 The Technical Specification for 110kV AC Cross-Linked Polyethylene Power Cable and Accessories

IEC 183 Guide to the Selection of High-voltage Cables

IEC 228 Conductors of Insulated Cables

IEC 229 Tests on cable oversheaths which have a special Protective Function and are applied by Extrusion

IEC 230 Impulse Tests on Cables and their accessories

IEC 287 Electric cables-Calculation for the Current rating.

IEC 332-1 Tests on electric Cables under Fire Conditions-Part 1: Test on a Single Vertical Insulated Wire or Cable

IEC 60840 Test for Power Cables with Extruded Insulation for Rated Voltages above 30kV (Um=36kV) up to 150kV(Um=170kV)

IEC 754 (1991) Test on Gases evolved during combustion of Cable Materials

IEC 811 Common Test Methods for Insulating and Sheathing Materials of Electric Cables.

IEC 859 Cable Terminals Rated Voltage 72.5 kV and over for Connection to Gas Insulated Closed Apparatus.

IEC 885 Electrical Test Methods for Electric Cables

IEC 949 Calculation for thermally permissible Short –Circuit currents, taking into account non-adiabatic heating effects

IEC 1034 Measurements for Smoke Density during the Cable burning under specified Conditions

2.0   Scope of supply.

There are totally eight (8) 110KV cable circuits in this scope, bidder can find the specific scope of supply from the Material List table (Attachment 1), bidder also can refer to the Single Line Diagram Drawing  (Drawing No. 60-016-00-0-0-00-006 Attachment 2) in red marked up to understand  their supply scope.

Note: Due to the bidding is holding before the detail designing, so the total length quantity of the cable is the estimated figure, Bidder shall give the unit price and the quantity discount together with the quotation for the additional or deletions.  

3.0    Scope of Service

 Apart from the scope of supply, Bidder shall confirm and give quotation for the  following work and service in their bid proposal:

3.1    Install of the 110kv cable accessories

3.2   Provide site supervision work for the cable pulling and cable (incl. cable accessories) test.

likun --- 2007-04-27 21:20:01

3

3.1   Review and make comments for the design of cable race work (trench / and the cable tray), if there is any routing design is not conform to the cable laying requirement, cable supplier shall inform the owner timely.

3.2  Help owner to check the cable length according to the cable routing drawing and the site actual  ( cable routing drawing will submitted to for the  final successful bidder later)

3.0    Technical Condition

                 The design, manufacture and test of the 110kV cross-linked polyethylene power cable and its accessories shall conform to the requirements of the standard indicated in Clause 2 except otherwise stipulated.

4.1   Application condition:

3.1.1        Power system Rated voltages (U0/U) and frequency: 64/110kv, 50Hz

3.1.2         Power system maximum operating voltage: 126kv

3.1.3         Type of earthing : Solid grounding

3.1.4         Basic Insulation Level (BIL) :

                Lightning Withstand Voltage: 550kv (peak value);

               Power Frequency Withstand Voltage of 30 Minutes: 160kv .

3.1.5        The expected three  (3 )  phases short circuits of conductor and lasting time: 40kA, 1s. 

3.1.6         The expected short circuits of single phase and lasting time: 19.6kA, 1s.

3.1.7         Cable transmission current: 

·        Circuits from power plant to regional substation : cross-section area is 400mm2, should not be smaller than 787A. Laying in the atmosphere.

·        Circuits from power plant to NO.11 substation : cross-section area is 240mm2, should not be smaller than 600A. Laying in the atmosphere.

·        Circuits from power plant to NO.10 substation :cross-section area is 240mm2, should not be smaller than 600A. Laying in the atmosphere.

·        Circuits from power plant to NO.4 substation :cross-section area is 240mm2, should not be smaller than 600A. Laying in the atmosphere.

4.2 Ambient Condition:

4.2.1        The average temperature in the hottest month: 28°C;  the average value of maximum temperature per day in the hottest month: 40°C;  in the groove, the average value of maximum temperature per day in the hottest month: 45°C.

4.2.2         Height difference: 20m

4.2.3         Power cable laid in the trench and /or cable tray within chemical plant should be antiseptic, wear-resisting, rodent and insect resistant , defend termites , water resistant  and well insulating .

4.2.4        Cable life-span shall be 30 years at rated conductor working temperature.

likun --- 2007-04-27 21:20:42

4

4.2           Cable laying :

4.2.1         Mechanical traction and laying.

4.2.2        Cable will be laid in the following type: Cable tray, cable trench etc.

4.2.3         Cable laying:

4.3.3.1 Cable Length arrangement information is shown in  the following table of cable list :

                                       CABLE LIST

Feeder  numbering

Cable size

(sqmm)

Circuits number

Phase*(1Segment length+2segment length +3 segment length)

Amount length(km)

P.P~Regional  sub.

400

2

3*(482.5+456+912.5)

11.328

P.P~No.#4 Sub.

240

2

3*(742.5+796.5)

 

 

23.446

P.P~ No.#11 sub.

240

2

3*(782.5+756.5)

P.P~No.#10 sub.

240

2

3*753

4.3.2.2      In each circuit, the three single-cores cables are arranged horizontally. The inter-phase space: 0.25m.

4.3.2.3      The two cable circuits are arranged as upper and lower layer. The inter-space of the two layers: 0.3m.

4.3.2.4      The metal sheath grounding: Cross-link or single-point earthing.

4.2.4        Cable laying in the tray shall adopt the sunshade blind and underground trench.

4.2.5        The distance between other loaded cable or heat source: 0.2m.

4.3               Operation requirement

4.3.1        Rated temperature of cable conductor shall be 90°C.

4.3.2        Maximum conductor temperature at the end of a short circuit shall be not less than 250°C.

3.1.1        Bending radium shall be not less than 15 times of cable overall diameter after installing and 20 times of cable overall diameter at installing.

4.0  Accessories of the cable

All the cable kits shall satisfy the following operation conditions:

·        short –circuit level :

                         (1)Three phases short –circuits: 40KA,1S

           (2)Single phase grounding fault level: 19.6KA ,1S  

·        Rated operating voltage: 110kv .

·         Lightning impulse voltage : 550kv

likun --- 2007-04-27 21:21:29

5

3.1  Cable termination:

Only two kinds of Cable termination kits will be used in this project: GIS connection termination, and the transformer termination.

3.1.1        Applicable termination Type:

·        110 kV GIS terminal:SF6–Gas immersed , plug-in type ( only Pfisterer product can be adopted )  cable  termination, Each suit  shall be consisted of  the female socket and the male connector, three phases.

·        Transformer oil immersed, conventional type, bidder can specify two or three cable accessories sub-vendor in their proposal.

3.2    Insulating & direct joint of the cable; T joint of the cable metal sheath

           

3.2.1        Insulating & direct joint of the cable;

              Adopting the whole pre-fabricated structure

3.2.1.1  The outside of the joint shall be fully covered by the sealer.  The sealer must be well bond with the outside sheath of the cable. The insulating level of the joint shall not be lower than that of the cable, and the insulating level of the sealer shall be equal to that of the outside sheath.  The voltage-withstand at both sides of the insulating ring of the insulating joint shall not be less than two times of the insulating level of the sealer of the cable.

3.2.2        T joint of the cable metal sheath.

The structure of the T joint has been shown in the attachment –5.

3.3   Cross-interconnection earthing box:

It shall adopt the stainless steel sealed case.  The internal wiring shall meet the single-phase fault requirement.  The protection degree shall not less than IP55, the Supplier shall submit the sealing test performance report.

4.0    Technical requirement

General: the cable shall be manufactured on a dry vertical VCV line, insulation ,inner and outer screens shall be adopted by simultaneous triple extrusion.

4.1  Cable conductor:

The conductor shall meet the requirement of IEC 228, which adopt the structure of twisted-compact circular conductor.  The conductor shall be smooth, free of grease and dirt, free of damaged shield and free of insulating burr, sharp edge, swelling, single wire fracture and any other defect.  It shall be tightly stranded through the compaction technology.

4.2   Conductor shielding

Conductor shielding is formed by super-smooth semi-conducting screen materials extruded on conductor.  The approximate thickness value is 0.81mm

4.3  Insulation

The insulation materials shall be the super-clean cross-linked polyethylene materials, the shield layer and insulating layer with three layers co-extruded and dry cross-linked method.

The nominal thickness of the main insulating layer shall conform to the provisions of GB11017, the eccentricity of main insulation is 8%.

4.4    Insulation shielding layer

Insulation shielding layer being the extruded super-smooth cross-linked semi-conducting shielding layer.

4.5  Moisture Barrier

Moisture Barrier: consisting of semi-conducting water stoppage expansion belt, to meet the requirements for longitudinal water stoppage.

4.6   Metal sheath (metal shield)

Metal sheath (metal shield): Only adopt seamless type corrugated Aluminum or Lead metal protective sheath. The purity of the aluminum shall not be lower than 99.6%, and the thickness 2.0mm. The surface of the metal sheath shall be free of such visible defects as abscess, impurity and cracks, and have excellent tightness, assuring no voltage drop at 0.4 Mpa, 0.5h air tightness test conditions.  The cross section of the metal sheath and metal shielding layer shall meet requirement of the single-phase short circuit fault.

4.7   Outside protective sheath

Outside protective sheath adopt PVC or PE extruded outside protective sheath. Supplier can also submit their professional proposal and the quotation if they consider PVC outside sheath is more suitable according the actual laying condition of this project.   The outside sheath shall uses the durable graphite conducting coat as electrode of the outside sheath for voltage-withstand test, in order to be easy to perform the voltage-withstand test after installation long-term operation.  The insulating resistivity of the PVC outside sheath (20): >3670 MΩ·km, and the sheath has the fire inhibiting property, with the oxygen index >30.  PE outside sheath has excellent water tightness, with the insulating resistivity (20): >10000 MΩ·km.  The insulating level of the
likun --- 2007-04-27 21:22:12

6

outside sheath: Lightning Impulse voltage withstand: 47.5 kV, power frequency voltage: 24 kV/1 min.

3.1  Marking

The information such as factory name, type of cable, voltage, conductor cross-section, manufacturing date and sign of measuring unit shall be printed in  outer sheath of cable in succession. It is not allowed there is no marking within continuous 1000mm length of the cable.

3.2  Pulling terminal

Each drum of cable must have a pulling terminal, which is crimped with the conductor, and firmly connected with the metal sheath.  The maximum allowable pulling force of the cable is 70 N/mm2, the lateral pressure shall not be less than 5 kN/m, and the laying bend radius shall not exceed 20 Ds (Ds refers to the external diagram of the cable), and not exceed 15 Ds after installation.

3.3  Cable drum

Cable should be supplied in returnable, strong, metal drum constructed to protect the cable against all damage and displacement during transit, storage and subsequent handling and stringing operations in the field.

4.0   Test and Inspection

4.1  Supervision

At all time of manufacturing, processing, test, inspection, the Owner’s representative have the right to supervise and witness. The Supplier can't refuse. The Owner’s representative is not responsible for quality of Goods.

4.2  Shop inspection

The Supplier shall five at least ten ( 10) working days notice  to the purchaser before the shop inspection and sample test are to be carried out, and the Owner should answer the Supplier whether go to witness within 10 days. Additional costs ,if any , for including witness tests shall be submitted with the quotation.

No Goods shall be dispatched from the manufacture’s factory  before it has been satisfactorily inspected and tested, unless the inspection is waived by the Owner in writing. In any case the Goods shall be dispatched only after all tests specified herein have been completed satisfactorily.

4.3  Type test

The type test certificates of the cable shall be provided in the quotation to confirm that the cable has been fully tested in according with the provisions of GB 11017 Standard.

The cable accessories shall be tested in according with the applicable IEC/GB publications. Certificates of the cable accessories shall also be provided in the quotation stage.

4.4  Routine test

The manufacture shall perform the routine test in according with DL509, GB11017 and requirement of this specification on the total cables, if  the cable will be shipped in units at different times , the routine test may be performed on the separated units , the results shall be record in the test report ,  the routine test should attached with drum, at the same time, the Supplier shall submit three copies of test report to the purchaser in addition.

Routine tests item

<DIV align=center>

NO.

Item

Method & Standard

1

Partial discharge test

GB 3048.12

2

Voltage test

GB 3045.8

3

Electrical test on non-metallic sheath

GB 11017

Partial discharge test under 1.5Uo, the discharge capacity should be smaller than 5pc.

</DIV>

4.5  Sampling test

Sampling test should be made in accordance with DL509 and GB11017, and test reports should furnished to Owner prior to shipment of the Goods.

 

Sample Tests Item

<DIV align=center>

NO.

Item

Method & Standard

1

Check of cable construction

GB 1101789

2

Measuring of electrical resistance of conductor

GB 3048.4

3

Measurement of capacitance

GB 3048.11

4

Hot set test

GB 2951.18

5

Micro-hole and impurity of XLPE insulation (1)

AEIC CS7

6

Shrinkage test of XLPE insulation (2)

GB 2951.33

</DIV>
likun --- 2007-04-27 21:23:15

7

<DIV align=center>

(1) The result of micro-robe impurity inspecting is consistent with the requirement of AEIC CS7—93

(2) Insulation constriction test, constriction rate ≤3%

</DIV>

3.1  Electrical test after installation

3.1.1         The electrical test after installation should adopt one of the following two test methods.

a) 64kV 24h power frequency withstand voltage test

b) 192kV 15min HV D.C. withstand voltage test.

3.1.2        D.C. withstand voltage test of outer sheath

Negative polarity     10 kV / minute

4.0    Packaging, storage and transportation

4.1  The cable drum used in cable delivering should have dependable waterproof sealed protection on two sides. Only one length of cable can be placed on each drum. The following content should be marked on cable drum: drum number, cable type, specification, length, gross weight, factory name, rotating direction, manufacture date and the purchaser’s name.

4.2  Methods of seal drum shall be decided by the delivery condition

4.3  A copy of routine tests report should be adhered on the cable drum

5.0  Design liaisons meeting and supervision

5.1  After the Purchase Order is placed, the design liaison meetings and manufacturing supervision will be adopted to arranging and inspecting the process of designing and manufacturing, so as to harmonizing the interface of design, properly solving the technical problem , promote the project executing , and satisfy the schedule of the project .

5.2  The design liaison meetings is arranged step by step by the progress of the schedule of the project , the numbers of the communion conference , the place of each meeting, the schedule , the numbers of people, the theme , and manufacture supervision or so , all of these will be settled and written in document before business contract is subscribed.

5.3  Before the meeting is taken place , both the Owner and the Contractor should exchange the technical documents and the drawings in advance . In the meeting, a minutes of the conference will be signed. And it will be milestone of the engineering design and the equipment manufacture.

5.4  Manufacturing Supervision: The time of manufacturing supervising is approximately set down in two stages which are date of the three layers co-extruded and routine tests. The Owner would inform the Purchaser the time to send representatives to supervise in the factory in advance.

6.0  Document commitment requirement:

Bidder is requested to submit the following document information in their bid proposal:

6.1  Proposal information :

·        110KV Cable and 110KV cable accessories product catalogue data.

·        110KV Cable and cable accessories completed specification /data sheets/ type tests report.

·        Overall dimensional outline data of the cable

·        Overall dimension of the cable kit such as cable transformer connection termination and cable splice etc.

·        List deviations from specifications, if applicable.

·        Name the testing authority and certificate number covering fault rating capability as specified.

·        Fulfill and submit the product illustration table (Attachment 3) together with the bid quotation proposal.

·        Submit the Sales and Operation Performance table (Attachment 4)

7.0  Attachment:

·         Attachment -1:Material List table

·         Attachment-2:Overall Key One Line Digram. Drawing No: 60-016-00-0-0-00-006.

·         Attachment -3: product illustration table need to be fulfilled and submitted by supplier.

·         Attachment -4:    Sales and Operation Performance Table

·         Attachment- 5:        Drawing: T jiont of metal sheath

 

likun --- 2007-04-27 21:25:10

8

大家好

这是110kv电缆的招标书样本,给做标书的同志以参考.

注:本人乃电缆专业毕业的,以后有什么问题还望大家互相讨论

成绍强 --- 2007-07-31 13:31:22

9

这怎么都是英文啊?

怎么看啊。好困难!

成绍强 --- 2007-07-31 13:31:27

10

这怎么都是英文啊?

怎么看啊。好困难!

成绍强 --- 2007-07-31 13:31:31

11

这怎么都是英文啊?

怎么看啊。好困难!

成绍强 --- 2007-07-31 13:31:34

12

这怎么都是英文啊?

怎么看啊。好困难!

成绍强 --- 2007-07-31 13:31:39

13

这怎么都是英文啊?

怎么看啊。好困难!

qibo --- 2007-08-05 19:00:39

14

菜鸟就是菜鸟,看不懂!!!
wn3393135 --- 2007-08-09 22:21:24

15

真的看不懂
shzhlalala --- 2007-12-13 20:00:02

16

大哥 能把汉语给出来吗?急要啊

 

shzhlalala --- 2007-12-13 20:07:58

17

真的看不懂                             
lzk0378 --- 2007-12-18 16:50:14

18

有中文吗

mao --- 2008-01-16 19:22:25

19

有没有中文的

ying265070 --- 2008-03-11 13:06:02

20

0啊,是英文啊
hxjun --- 2008-07-01 16:10:45

21

大哥  能不能给个中文版本啊

我们目前只做国内生意   谢谢!

amaomjg --- 2009-07-24 09:30:12

22

没中文的嘛

-- 结束 --